The Kempton Park brief: cleaner starts, less rework
The client is a general engineering workshop in Kempton Park making mixed batches for local industry, with work moving between short runs and repeat parts. Their main problem was not a lack of machine capacity, but inconsistency at the drilling stage. Some holes were starting cleanly, others wandered slightly on entry, and tool life was changing too much from one batch to the next.
They asked us to standardise the drill range on CNC machining centres so the team could get cleaner starts, more predictable hole size and fewer offsets during setting up. The job had to suit ordinary day-to-day production, not just one ideal part. That meant selecting drills that could handle mild steel, stainless sections and occasional tougher material, while still giving stable results on long shifts.
The workshop also wanted a supply plan that would work in Kempton Park conditions. Dust, coolant carryover and stop-start work during load-shedding all affect tool performance, so the solution needed to be practical, not fussy.


